Wilke Enginuity Inc.

Custom Fabrication of Climbing Wall Frames for the Pool Industry

A customer in the pool industry contracted Wilke Enginuity Inc. to perform the custom fabrication of limbing wall frames for use in a swimming pool application. 1 1/2" stainless steel tubing was selected for the project, and expert precision cutting, bending, forming, and welded techniques were carried out to meet the required configurations. Framing was completed with the application of a durable and attractive white powder coating finish.

300 units were produced for the customer after a turnaround time of 3 to 4 weeks. Our years of contract manufacturing experience enable us to offer cost effective turnkey solutions for projects of any size. 

Fabrication of Climbing Wall Frames Project Highlights

Product Description
Climbing Wall Frames for Swimming Pools
Capabilities Applied/Processes
Primary:
  • Welding
  • Cutting
  • Bending
  • Forming
Secondary:
  • Shipping and Packaging
Equipment Used to Manufacture These Climbing Walls
CNC Machining
CNC Lathe
5000 Watt Mitsubishi Laser
Overall Climbing Wall Part Dimensions
Consisted of 1 1/2" by 1 1/2" Tubing
Material Used
Stainless Steel
Material Finish
Powder Coating White
In Process Testing/Inspection Performed
Customer Specific
Industry for Use
Pool
Volume
300
Delivery/Turnaround Time
3 - 4 Weeks
Standards Met
Customer Specifications